KitLog pro

Powered By Kitlog Pro v2.0

Jasons Thatcher buildlog
' style=
Date:  8-22-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  More powder coat and drilling

Drilled the right spar attach brackets and powder coat them. Still have to make the rib bracket for station 1 and the outer 4 stations on the tip spar. 1/2" reamer is on it's way so I can drill the wing bolt holes soon.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.