Powered By Kitlog Pro v2.0
Jasons Thatcher buildlog
CX5
All
8-22-2014
< Previous Log Entry
Next Log Entry >
Date:
8-22-2014
Number of Hours:
4.00
Manual Reference:
Brief Description:
More powder coat and drilling
Drilled the right spar attach brackets and powder coat them. Still have to make the rib bracket for station 1 and the outer 4 stations on the tip spar. 1/2" reamer is on it's way so I can drill the wing bolt holes soon.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CX5 Home
Category
# Logs
# Hours
All
107
475
Avionics
1
3
Empennage
2
6
Engine
3
10
Fuselage
64
348
Miscellaneous
2
11
Tools
2
2
Wings
33
95
Copyright © 2001-2024 Matronics. All Rights Reserved.