KitLog pro

Powered By Kitlog Pro v2.0

Rans S-7S Courier
' style=
Date:  10-11-2009
Number of Hours:  1.00
Manual Reference:  05D-01
Brief Description:  Fuel and Vent Line installation

Cleaned the vent lines in and outside before installation.

Installed the forward vent line. Used anti-chafe tape at the clamp positions.

Installed the aft vent line and connected the aft and forward vent line with the 90-degree fitting.

Located the gussets on the rib stiffners, drilled and rivited the gussets in place.

Installed the forward vent line inboard to the tee fitting on top of the tank.

Taped all tube openings closed for covering and painting.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.