Powered By Kitlog Pro v2.0
Rans S-7S Courier
S7S
Wing LH
10-11-2009
< Previous Log Entry
Next Log Entry >
Date:
10-11-2009
Number of Hours:
1.00
Manual Reference:
05D-01
Brief Description:
Fuel and Vent Line installation
Cleaned the vent lines in and outside before installation.
Installed the forward vent line. Used anti-chafe tape at the clamp positions.
Installed the aft vent line and connected the aft and forward vent line with the 90-degree fitting.
Located the gussets on the rib stiffners, drilled and rivited the gussets in place.
Installed the forward vent line inboard to the tee fitting on top of the tank.
Taped all tube openings closed for covering and painting.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S7S Home
Category
# Logs
# Hours
All
197
810
Control Systems
7
18
Covering
46
251
Delivery
4
21
Fuselage
21
45
Gear
3
4
LH Wing
11
42
Painting
50
235
Wing LH
11
42
Wing RH
22
76
Wings
22
76
Copyright © 2001-2024 Matronics. All Rights Reserved.