Rans S-7S Courier
S7S
Wing LH
10-10-2009
< Previous Log Entry
Next Log Entry >
Date:
10-10-2009
Number of Hours:
4.00
Manual Reference:
05B-02
Brief Description:
Fuel Tank Installation
Riveted a single nut plate to the top of the S2-SAB.
Installed the outer tank support tube.
Positoned the fuel tank with 1/8 gap in front and between compression tube.
Bolted the wing tank mount brackets to the fue tank.
Two clamps added to the two rear outboard brackets. Used loctite blue to all the bolt threads.
Drilled to the brackets into the support tubes and rivited the brackets in place with stainless steel rivets.