Powered By Kitlog Pro v2.0
Rans S-7S Courier
S7S
LH Wing
10-11-2009
< Previous Log Entry
Next Log Entry >
Date:
10-11-2009
Number of Hours:
1.00
Manual Reference:
05D-01
Brief Description:
Fuel and Vent Line installation
Cleaned the vent lines in and outside before installation.
Installed the forward vent line. Used anti-chafe tape at the clamp positions.
Installed the aft vent line and connected the aft and forward vent line with the 90-degree fitting.
Located the gussets on the rib stiffners, drilled and rivited the gussets in place.
Installed the forward vent line inboard to the tee fitting on top of the tank.
Taped all tube openings closed for covering and painting.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S7S Home
All
Control Systems
Covering
Delivery
Fuselage
Gear
LH Wing
Painting
Wing LH
Wing RH
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.