Powered By Kitlog Pro v2.0
Rans S-7S Courier
S7S
All
9-7-2008
< Previous Log Entry
Next Log Entry >
Date:
9-7-2008
Number of Hours:
11.00
Manual Reference:
07C-02
Brief Description:
Covering Fuselage
Today we covered the top of the fuselage, took a lot of time to smooth the corners.
The top cover is made out of two halves , a left side and a right side.
The overlap is 1 1/2 inch.
Next job will be final tightening the fabric with a household iron, the iron must be calibrated to
350 degrees fahrenheit.
09:00 AM
08:00 PM
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S7S Home
Category
# Logs
# Hours
All
197
810
Control Systems
7
18
Covering
46
251
Delivery
4
21
Fuselage
21
45
Gear
3
4
LH Wing
11
42
Painting
50
235
Wing LH
11
42
Wing RH
22
76
Wings
22
76
Copyright © 2001-2024 Matronics. All Rights Reserved.