Powered By Kitlog Pro v2.0
Rans S-7S Courier
S7S
All
7-17-2010
< Previous Log Entry
Next Log Entry >
Date:
7-17-2010
Number of Hours:
3.00
Manual Reference:
07A-01
Brief Description:
Wing LH Covering preparation
Cleaned the entire frame and removed all metal shavings left from drilling.
Used Scotch brite on all sheet metal surfaces, cleaned with acetone.
Cut the formed Lexan bolt cover, glued on the bolt cover.
Applied anti chafe tape around sharp edges.
Brushed two coats of thinned polybrush to the sheet metal. The thinned polybrush prevents pin holing in the paint finish.
The lefthand wing is now ready for covering.
Bolt Cover
Anti Chafe Tape
Two coats of Polybrush
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S7S Home
Category
# Logs
# Hours
All
197
810
Control Systems
7
18
Covering
46
251
Delivery
4
21
Fuselage
21
45
Gear
3
4
LH Wing
11
42
Painting
50
235
Wing LH
11
42
Wing RH
22
76
Wings
22
76
Copyright © 2001-2024 Matronics. All Rights Reserved.