KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  2-23-2016
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Fuel pump cover, fairings and cowl

Installed and wired cabin light. Used an LED dome light purchased at Advanced Auto and mounted it on the bottom of the subpanel bottom flange. It illuminates the footwell very nicely.

Drilled the fuel pump cover for velcro disks. Pop riveted the disks to the cover. Installed the cover in the cockpit and then applied the carpet pieces to the cover.

Sanded Smooth Prime coat on wheel fairings, langing gear leg fairings and intersection fairings.

Fitted upper and lower cowl to fuselage and did some fnal sanding where the halves meet.

Applied Smooth Prime to upper and lower cowl.
' style=

Fuel pump cover installed with carpet covers

Fuel pump cover installed with carpet covers

' style=

Fairings sanded and ready for priming

Fairings sanded and ready for priming

' style=

Smooth Prime applied to cowl halves

Smooth Prime applied to cowl halves

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.