KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  2-10-2016
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Cowling, inlet fittings

Today I fitted the lower cowl to the fuselage and then made up the neoprene tubes that connect the cooling and induction air inlet rings with the plenum and induction air filter housing. These are cut from sheet neoprene and then glued into a tube.

The upper cowling was also fitted to the lower cowling while I had it on the plane. I had to make a few adjustments and am not completely happy with the way the top cowl is fitting. I think I can use some micro mixture to fill the gaps between the cowl halves.

I do see that my camera has again forgotten the date and gone back in time. Curious how this happens every now and then.

I also input various refernce speeds into the Dynon EFIS.
' style=

Inlet ring to plenum tube

Inlet ring to plenum tube

' style=

Inlet ring to filter housing tube

Inlet ring to filter housing tube

' style=

Ring to filter housing with lower cowl in place

Ring to filter housing with lower cowl in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.