Powered By Kitlog Pro v2.0
Bills RV-7 Build Site
RV-7
Fuselage
12-4-2015
< Previous Log Entry
Next Log Entry >
Date:
12-4-2015
Number of Hours:
6.00
Manual Reference:
9-15
Brief Description:
Base and canopy top molding
More sanding today. Moved from 60 grit to 100 grit sandpaper and feathered down endes to match electrical tape used to mask edge lines.
Top layer of electrical tape was removed and edges feathered down to surface of bottom level of tape.
Moldings sanded smooth, vacuumed and then wiped down with a wet rag in preparation for applicatin of epoxy coats.
Doghouse drilled to rear canopy and skirts and dimpled.
Molldings sanded and cleaned
Doghouse.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
482
2070
Avionics
24
130
Electrical
12
68
Empennage
60
184
Engine
34
181
Fuselage
189
954
Landing gear
14
68
Miscellaneous
9
4
None
11
Service Bulletins
4
14
Shop Supplies
1
Tanks
31
115
Tools
2
Wings
91
352
Copyright © 2001-2024 Matronics. All Rights Reserved.