KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  6-17-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Firewall recess

Gave the hangar some much needed cleaning and removed some of the work aids I no longer needed.

Wired stall warning to Intercom.

Assembled firewall recess to firewall using ProSeal and clecoing in place.I will rivet tomorrow after ProSeal has partially cured. Used proSeal to fill holes at corners of firewal recess.

Studid the installation manual for the Christen inverted oil system and have a rough plan for where to locate the various components.

Safety wired the heat control cable to the Adel clamp securing it.

Filed the bottom front corners of the fuselage to provide clearance for the landing gear legs.
' style=

Firwall recess clecoed in place

Firwall recess clecoed in place

' style=




' style=

Heat cable safety wired

Heat cable safety wired

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.