Powered By Kitlog Pro v2.0
Bills RV-7 Build Site
RV-7
Fuselage
4-2-2015
< Previous Log Entry
Next Log Entry >
Date:
4-2-2015
Number of Hours:
5.00
Manual Reference:
Brief Description:
Parking brake, paint, antenna doublers
Completed the installation of the parking brake control and brackets.
Drilled the armrests for headset and mic plugs.
Did some touch-up painting to the cabin on the sides above the armrests.
Fabricated 3 skin doublers for COM, Transponder and ADS-B antennas.
Changed orientation of mounting brackets for throttle quadrant to allow for control cables and drilled brackets to panel and subpanel.
Parking brake
Side walls repainted
Throttle quadrant mount
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
482
2070
Avionics
24
130
Electrical
12
68
Empennage
60
184
Engine
34
181
Fuselage
189
954
Landing gear
14
68
Miscellaneous
9
4
None
11
Service Bulletins
4
14
Shop Supplies
1
Tanks
31
115
Tools
2
Wings
91
352
Copyright © 2001-2024 Matronics. All Rights Reserved.