KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  2-4-2015
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Fuselage odds and ends

Removed right fuel line and bent a new one, which I am also not happy with. More tubing to be ordered tonight.

Mounted platenuts to parking brake valve bracket and riveted bracket to firewall.

Installed one side skin rivet on each side at the main bulkhead which had been omitted earlier. Who knows why, but it was the same rivet on each side. They were a bit hard to get to with the canopy decks in place but I was able to use the back rivet plate as a bucking bar and drove them just fine.

Cut and installed tubing from brake reservoir to master cylinders.

Vent tubing for left side formed and installed.

Bolted shoulder harness attachment wires to brackets on fuselage.

Cut and installed static line from port bulkhead to ADHRS area.

Removed roll bar and cut attachment flange to match canopy deck. Cut then ground, cleaned and painted. Roll bar reinstalled on fuselage with all bolts and spacers.
' style=

Brake supply lines run

Brake supply lines run

' style=

Parking brake mounted

Parking brake mounted

' style=

Roll bar mounted after cutting flange

Roll bar mounted after cutting flange

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.