Powered By Kitlog Pro v2.0
Bills RV-7 Build Site
RV-7
Fuselage
1-15-2015
< Previous Log Entry
Next Log Entry >
Date:
1-15-2015
Number of Hours:
8.00
Manual Reference:
8-16,8-18
Brief Description:
Fitting empennage
Remade elevator stop and drilled it to the VS rear spar.
Trues VS to perpindicular to HS, then drilled rear spar to end bulkhead and tailwheel mount.
Set proper height and angle for front of VS and clamped and then drilled the front spar to the attach plate.
Completed elevator pushrod tubes by riveting end pieces to tubes and inserting end fittings and set to proper length.
Installed elevators and attached read pushrod to elevator horns and bellcrank.
Attached rudder and checked for proper movement.
Finishing Kit was delivered and I moved it into position in the hangar. Unpack and inventory will wait.
Elevator stop bolted to VS spar
VS front spar drilled to attach plate
Finishing kit arrives!!!!
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
482
2070
Avionics
24
130
Electrical
12
68
Empennage
60
184
Engine
34
181
Fuselage
189
954
Landing gear
14
68
Miscellaneous
9
4
None
11
Service Bulletins
4
14
Shop Supplies
1
Tanks
31
115
Tools
2
Wings
91
352
Copyright © 2001-2024 Matronics. All Rights Reserved.