KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  1-14-2015
Number of Hours:  3.50
Manual Reference:  8-16, 8-17
Brief Description:  VHorizontal and Vertical stabilizers

Completed drilling of horizontal stabilizer to fuselage. Temporarily bolted in place.

Modified vertical stabilizer spar as required. Wonder why Van's didn't call this out before staring VS construction? It would have been much easier that.

Mounted VS to fuselage and clamped. Measured, adjusted, reclamped, repeat and so on. Trying to get everything square.

Clamped VS attach plate to horsizontal stabilizer.

Fabricated Elevator stop from angle stock.
' style=

VS attach plate clamped

VS attach plate clamped

' style=

Vertical Stabilizer in place

Vertical Stabilizer in place

' style=

Elevator stop

Elevator stop

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.