I completed deburring edges and rivet holes on the components for bulkhead 706. All aluminum angle parts were primed. The bulkhead and belcrank support ribs were reassembled and riveted together. A portion of this component was left un-riveted as this will be done in a future step.
Net I assembled the components to bulkheads 707 and 708. Both were drilled as needed for snap bushings, then were match drilled and riveted.
Lastly I gathered up the components and materials for the last of the bulkheads, 709-712 in preparation for the next session.
After this I gave the hangar a good clean up and vacuuming as a lot og metal had accumulated from the past few sessions.