KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-16-2014
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Fuselage kit delivery!

This afternoon Old Dominion Freight delivered the fuselage kit to the airport. The lift gate easily lowered the crate to the ground, then I put moving dollies underneath to roll it into the hangar Once positioned in the hangar I removed the dollies and removed the top of the crate. Just like a kid a Christmas I plundered through the packing paper to discover the treasures within.

I spent the rest of the afternoon removing, unwrapping, logging each part on the packing list and then putting the parts away. I made it mst of the way through before calling it quits. I took the sack of hardware bags home and spent much of the evening counting bolts, nuts, washers and such at the kitchen counter.
' style=

Opening of crate

Opening of crate

' style=

Lots of packing paper

Lots of packing paper

' style=

Shelves filling up with parts

Shelves filling up with parts

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.