KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  4-28-2014
Number of Hours:  4.00
Manual Reference:  7-6
Brief Description:  Assemble inner ribs to skin with sealant

Tank work continues and today I assembled all of the inner ribs to the tank skin with tank sealant, clecoing every hole. Also sealant clecoed the filler flanges and the drain flanges to the skin.

I purchased an electronic postage scale at Office Depot on my way to the airport, and this was used to measure the correct proportion of sealant and hardener.

This is all still pretty messy work, but today's session was somewhat better than the previous.
' style=

Inner ribs clecoed with sealant

Inner ribs clecoed with sealant

' style=

Ribs clecoed every hole

Ribs clecoed every hole

' style=

Drain flange

Drain flange

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.