Installed battery in battery case. Fabricated and installed battery ground cable.
Drilled pitot probe to mast. Deburred and tapped holes. Cut pitot and AOA tubes to length, deburred and flared. Riveted pitot mast to bottom of left wing. Installed pitot probe and plumbed pitot and AOA tubing to probe.
Constructed brace to support wing root during installataon.