Brief Description: Wing bolts torqued, gusset bolts, left tank
Washers and nuts were threaded on all wing attach bolts. Bolts and nuts were torqued to proper value. Gusset attaching main bulkhead to side of fuselage were bolted and bolts torqued to proper value.
Bulkhead upright cap strips were positioned and some of the pull rivets applied.
The left fuel tank was positioned on the wing. Fuel and vent lines were attached. Fuel sender wires were attached. Bolts to attach brackets were installed and torqued to proper value. About a third of the screws attaching the tank skin to the spar were installed.
The aileron pushrod on the left wing was connected at the bellcrank and at the control yoke.,
Wire for left wing were connected at fuselage. Pitot and AOA tubing in left wing was attached at fuselage.