Powered By Kitlog Pro v2.0
Bills RV-7 Build Site
RV-7
All
11-12-2015
< Previous Log Entry
Next Log Entry >
Date:
11-12-2015
Number of Hours:
5.00
Manual Reference:
9-11, 9-13
Brief Description:
Canopy preparation
The day was spent preparing the vaious canopy components for final assembly.
The cover strip was drilled to the canopy, then removed, deburred and holes dimpled.
The canopy was drilled to final hole size and countersunk as required by the attach screws and rivets.
The canopy frame rivet holes were drilled to final size as required.
The side skirt, inside skirt and skirt brace pieces were drilled to final size, holes deburred and countersunk of dimpled as required.
Cover strip being drilled to canopy
Canopy beinf final drilled and countersunk
Side skirt parts drilled, deburred and dimpled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
482
2070
Avionics
24
130
Electrical
12
68
Empennage
60
184
Engine
34
181
Fuselage
189
954
Landing gear
14
68
Miscellaneous
9
4
None
11
Service Bulletins
4
14
Shop Supplies
1
Tanks
31
115
Tools
2
Wings
91
352
Copyright © 2001-2024 Matronics. All Rights Reserved.