KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  11-12-2015
Number of Hours:  5.00
Manual Reference:  9-11, 9-13
Brief Description:  Canopy preparation

The day was spent preparing the vaious canopy components for final assembly.

The cover strip was drilled to the canopy, then removed, deburred and holes dimpled.

The canopy was drilled to final hole size and countersunk as required by the attach screws and rivets.

The canopy frame rivet holes were drilled to final size as required.

The side skirt, inside skirt and skirt brace pieces were drilled to final size, holes deburred and countersunk of dimpled as required.
' style=

Cover strip being drilled to canopy

Cover strip being drilled to canopy

' style=

Canopy beinf final drilled and countersunk

Canopy beinf final drilled and countersunk

' style=

Side skirt parts drilled, deburred and dimpled

Side skirt parts drilled, deburred and dimpled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.