Brief Description: Install and rig elevators, replace VS, revise pane
I removed the rudder and vertical stab so I could complete the installation of the elevators and attachement of the control pushrod to the elevator horns. Then the VS and rudder were reinstalled.
Based on some feedback I revised the layout of the instrument panel to center the main display right in front of the pilot's seat and moved the back-up instruments off to the right. I do think this is an improvement!
Attached the elevator pushrod to the control yoke. I had to extend the forward pushrod a lot to get the correct up/down deflection, which concerned me until I remembered that I had to screw the ends all the way in to make the pushrod as short as possible to get it into the pushrod tunnel.