KitLog pro

Powered By Kitlog Pro v2.0

Martin's Web Site
' style=
Date:  5-26-2007
Number of Hours:  9.00
Manual Reference:  8-10,11
Brief Description:  F714 Aft Deck & miscellaneous

AFT DECK: - Fabricated the aft deck spacers - Clamped the aft deck into place and removed the small amount of twist present in the fuselage. There was very little to begin with. The bubble in the level was barely touching the port side level line. Drilled the aft deck and spacers into place. - Removed and prepped parts and then reassembled and riveted. Decided not to prime these as all parts are Alclad. - Riveted F709 bulkhead to foreward end of aft deck. FINISHING THE BELLCRANK SUPPORT - Riveted the F728B angle to F728A channel in place. - Finished riveting the F728A to the bulkhead assembly. - Trial fit the F635 Bellcrank and then removed and stored. SHOULDER HARNESS ANCHORS - Drilled holes for mounting the anchors. Messed up on the left side, laying out the holes relative to the F709 bulkhead instead of the F708. I didn't catch the mistake until after I drilled one of the 3 holes. I'm thinking I can fill it w/ a 5/16 rivet, but I haven't tried, yet.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.