KitLog pro

Powered By Kitlog Pro v2.0

Martin's Web Site
' style=
Date:  9-12-2005
Number of Hours:  4.00
Manual Reference:  7-
Brief Description:  Various Right Wing Tasks

Been putting in little bits of time here and there over past week, but nothing significant accomplished until today. (1) During last week, verified right fuel tank was sealed. Had to put some loctite into BNC connector to seal a pinhole bubbler. (2) Finished mounting aileron to wing and torquing all connections. Removed the control stick to bellcrank pushrod and will store until ready to mate the wings to the fuselage. (3) Ran conduit through the wing and glued to each rib. (4) Aligned the flap and drilled the wing-side of the flap hinge. Countersunk the flap brace to accept the skin dimples. (5) Cleaned the right tank, put the wing back in the stand and mated the tank z-brackets to the spar. Used loctite on the screw threads and torqued to 25 in-lbs. Still need to install the tank skin screws.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.