Rolled leading edges and blind riveted w/ help from Mike Veth. Installed the rod-end bearings. With Penny and Connor's help, hung the elevators on the horizontal stab. Trimmed the horizontal stab skin for clearance w/ the elevator horns and trimmed the bottom flange of the HS603PP rear spar to increase elevator travel..