Brief Description: Leading edges parts preparation - Ribs
According to the plans, all the ribs need to have to front curved part to be smoothed out. Need to be careful here. Very easy to over grind the thin material. Next, there are 4 ribs (W-1009-1L/R and W-1009-2L/R) to trim out the aft flange so they can fit on the main spar. The Dremmel work great here.