KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
' style=
Date:  5-19-2007
Number of Hours:  4.50
Manual Reference:  18.5
Brief Description:  step 1-5

During this part louie prept the fuel tank to be put together.
David mixed up a batch of tank sealer after finishing up on his parts of the airleron.
the sealer was applied to the stifiners and louie clocoed the in place.
Mark applied the sealer to the out side of each rivit holes and inserted all the rivits.
while David and Louie bucked them. Intersting enough the tank sealer held all the rivits like riverter tape.
The only change we did form the prints is I decided to use 4266-3 in the holes used for hydro forming with the dimpel pointing out giving a large sealing area.
we will continue monday on the tank.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.