KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 260
Category Work Time: 1027 Hours
 Date
Hours
Work Log Summary

Details

 03-31-2011
18.50
wheel pants
Details

 03-31-2011
2.50
sand prime doors

 03-22-2011
22.00
inside of top
Details

 01-05-2011
35.00
instal ox system
Details

 05-12-2010
1.50
frount wheel
Details

 03-26-2010
5.75
fire wall
Details

 03-25-2010
9.50
install rear seat power port
Details

 02-25-2010
3.00

Details

 02-25-2010
4.50

Details

 02-24-2010
2.50
wiring
Details

 02-15-2010
5.50
cut the allu blocks
Details

 02-11-2010
4.50
continued on the sb
Details

 02-08-2010
5.50
started to work on sb for door
Details

 02-06-2010
3.50
door work
Details

 12-08-2008
3.50
gas strut
Details

 12-06-2008
5.50

Details

 12-04-2008
1.50
cut the racki
Details

 12-03-2008
2.50
door handel
Details

 12-02-2008
1.50
started on the door handel;
Details

 11-26-2008
3.50
finished the door side
Details

 11-25-2008
2.80
hing and pins
Details

 11-19-2008
6.50
door work
Details

 11-18-2008
5.50
door work
Details

 11-12-2008
4.50
door work
Details

 11-11-2008
3.50
door work
Details

 06-09-2008
3.50
top work
Details

 06-07-2008
10.50
rear window
Details

 06-02-2008
6.50

Details

 05-31-2008
7.50


 05-29-2008
5.50
fiting of the top
Details

 05-28-2008
3.50


 05-24-2008
8.50
sanding the top
Details

 05-22-2008
3.50
marking the fus for the top
Details

 05-03-2008
7.50
back seat
Details

 05-01-2008
3.50

Details

 04-30-2008
2.75

Details

 04-29-2008
1.50


 04-28-2008
2.25

Details

 04-17-2008
5.50

Details

 04-12-2008
1.50

Details

 04-12-2008
3.50

Details

 04-11-2008
1.50

Details

 04-10-2008
1.50


 04-09-2008
2.50

Details

 04-05-2008
8.50

Details

 04-04-2008
5.50

Details

 04-04-2008
1.50

Details

 04-03-2008
2.75


 04-02-2008
3.25
break pedal
Details

 03-31-2008
3.25
fuel lines
Details

 03-30-2008
2.75
fuel lines
Details

 03-01-2008
12.75
break lines
Details

 02-28-2008
2.75

Details

 02-27-2008
2.25

Details

 02-26-2008
3.25

Details

 02-25-2008
3.50

Details

 02-23-2008
11.50

Details

 02-21-2008
3.50


 02-20-2008
3.50

Details

 02-19-2008
2.75

Details

 02-18-2008
3.25

Details

 02-18-2008
1.50

Details

 02-16-2008
13.00

Details

 02-14-2008
3.50

Details

 02-13-2008
3.50

Details

 02-12-2008
3.75

Details

 02-11-2008
3.50

Details

 02-09-2008
17.00

Details

 02-05-2008
2.00

Details

 02-04-2008
1.75

Details

 02-02-2008
14.25
step to start of inst panel
Details

 01-28-2008
2.25

Details

 01-26-2008
2.20
landing gear
Details

 01-24-2008
3.75
landing gear
Details

 01-22-2008
3.50

Details

 01-21-2008
3.75
back seat vent
Details

 01-19-2008
4.25

Details

 12-17-2007
3.50


 12-17-2007
6.50

Details

 12-16-2007
2.25


 12-15-2007
12.25

Details

 12-13-2007
2.25

Details

 12-12-2007
3.25

Details

 12-10-2007
17.00
mega day
Details

 12-09-2007
3.50
role of skin
Details

 12-05-2007
3.50

Details

 12-04-2007
1.50


 12-03-2007
3.50
fus longerons
Details

 12-02-2007
3.75

Details

 12-01-2007
10.00

Details

 11-29-2007
3.50

Details

 11-28-2007
2.50

Details

 11-26-2007
3.75

Details

 11-24-2007
1.50
seat support

 11-22-2007
5.50

Details

 11-20-2007
2.75

Details

 11-19-2007
3.50

Details

 11-10-2007
7.50
seat and stick mount
Details

 11-10-2007
5.25
frount skin suppourt
Details

 11-09-2007
4.25

Details

 11-06-2007
3.50

Details

 11-05-2007
3.50
caben heat boxes
Details

 11-03-2007
3.50
finish up fire wall
Details

 11-03-2007
6.80

Details

 11-01-2007
2.25
forward fuselage rib
Details

 10-30-2007
3.25
firewall
Details

 10-29-2007
4.50
rivet bottom skin on
Details

 10-29-2007
2.50
firewall
Details

 10-27-2007
5.50
bottom skins
Details

 10-25-2007
4.50
bagadge ribs
Details

 10-23-2007
6.50
badgage ribs
Details

 10-22-2007
6.50
rear seat ribs
Details

 10-20-2007
4.00

Details

 10-20-2007
2.50

Details

 10-18-2007
3.50

Details

 10-17-2007
1.50

Details

 10-16-2007
5.50
rear spar
Details

 10-15-2007
4.25
bolting parts on spar
Details

 10-13-2007
3.00
work on center spar
Details

 10-10-2007
3.50
made brackets
Details

 10-09-2007
4.50
starting of the fus
Details

 09-25-2007
2.50


 09-24-2007
1.25


 09-22-2007
3.50
check in all parts
Details

 09-02-2007
1.25
push rod assembly
Details

 09-01-2007
2.50
lens instal
Details

 08-30-2007
1.50
trimed lense
Details

 08-29-2007
1.50
continued on instalation of optional lites
Details

 08-27-2007
1.50
optional lites
Details

 08-25-2007
3.50

Details

 08-23-2007
2.50
step 5
Details

 08-22-2007
2.50
fiting wing tip
Details

 08-21-2007
2.50
steps 1-5
Details

 08-21-2007
1.25
compleated step1-4

 08-20-2007
1.25
steps 3-5
Details

 08-18-2007
3.50
step 1 -3 right wing
Details

 08-16-2007
0.50
Stall switch
Details

 08-11-2007
2.50
left fuel tank back plate
Details

 08-11-2007
2.75
finish bottom skin right wing steps 10-12
Details

 08-08-2007
2.50
rivit bottom skins
Details

 08-07-2007
1.50
rivit on the right skin inboard
Details

 08-06-2007
1.50
right bottom skins
Details

 08-05-2007
3.50
aileron bellcrank
Details

 08-04-2007
2.50
torque tube
Details

 08-04-2007
4.50
Steps 1-4
Details

 07-19-2007
3.50
finished left flap
Details

 07-16-2007
2.50
de bur/dimple
Details

 07-14-2007
5.50
finished right flap
Details

 07-12-2007
1.50
continued to assembled the flap
Details

 07-11-2007
1.25
we compleated step 1 and 2
Details

 07-10-2007
1.50
steps 4-6
Details

 07-09-2007
1.25
steps 1-3
Details

 07-07-2007
6.50
step 1-6
Details

 07-07-2007
5.50
Fuel tak
Details

 07-05-2007
2.50
steps 1-8
Details

 07-03-2007
2.50

Details

 07-02-2007
1.25

Details

 06-05-2007
1.25
fuel tank
Details

 06-04-2007
2.50
started on the right tank
Details

 06-03-2007
5.50
ataching ribs and subassemblies
Details

 06-02-2007
3.50

Details

 05-31-2007
8.25

Details

 05-30-2007
15.50

Details

 05-19-2007
4.50
step 1-5
Details

 05-19-2007
3.25
drilling on the hinges for left aileron
Details

 05-17-2007
5.50
this entry is a total for the week for the fuel ta
Details

 05-17-2007
5.50
driling on the nose ribs
Details

 05-12-2007
3.50
fuel tank
Details

 05-10-2007
1.50
compleated steps 1-3
Details

 05-09-2007
1.25

Details

 05-07-2007
2.50
fuel tank

 05-07-2007
2.50
Cut pito mount in lower wing skin
Details

 05-06-2007
5.50
Bottom wing skins and pito mount
Details

 05-05-2007
15.50
Total fuel tank up to today
Details

 05-03-2007
1.50
continued to dimpel left wing ribs
Details

 05-02-2007
1.25
dimpel wing ribs
Details

 04-23-2007
1.25
Winsg and fuel tank
Details

 04-21-2007
4.50
back rivit top winh skin
Details

 04-19-2007
1.25
started on right wing skin
Details

 04-18-2007
8.50

Details

 04-15-2007
3.50
wing constriction continues
Details
     

 04-08-2007
2.50

       

 03-31-2007
2.50

     

 03-30-2007
3.50
finished riviting left wing
Details
     

 03-29-2007
1.50
more riviting on top skin of left wing

 03-28-2007
1.25
left wing leading edge
     

 03-19-2007
1.25
dimpled skins
Details
     

 03-18-2007
5.50
dimpled the inboard skins
Details

 03-16-2007
2.50
compleated step 1-4
Details

 03-10-2007
8.20
compleated all the steps in a Saturday afternoon
Details

 03-05-2007
1.25
steps 1 and 2
Details

 03-04-2007
3.50
started on the ribs of the left wing
Details
       

 03-01-2007
1.50
steps 1-6
Details

 02-28-2007
3.50
started to work on right main spar
Details

 02-24-2007
2.50
cleaned shop in prep for all the girl scout cookie
Details

 02-23-2007
5.50
completed the steps for left wing
Details

 02-17-2007
3.50
started on the main spar
Details

 02-16-2007
3.50
steps 1-3
Details

 02-15-2007
2.00
assembled trim unit
Details

 02-14-2007
2.50
primed all parts
Details

 02-13-2007
2.50
started on trim unit
Details

 01-29-2007
1.25

Details

 01-27-2007
3.50

Details
       

 01-26-2007
3.50
dimple and prime
Details

 01-25-2007
2.50
more dimple
Details

 01-24-2007
1.25
dimpled and primed parts
Details

 01-23-2007
1.50
dibured more parts/ bulk heads for tail cone

 01-22-2007
3.50
built rack for compleated parts
Details
     

 01-14-2007
7.50
trailing edge ribs
Details
       

 01-12-2007
3.50
riveting the root rib,spars and skins
Details
     

 01-10-2007
4.50

Details

 01-09-2007
2.50
back riviting ribs to skins
Details

 01-07-2007
6.50
Riveting
Details
       

 01-06-2007
1.25
rivet e-903 to 904
Details

 01-05-2007
3.50
riveting root rib spars
Details

 01-04-2007
2.50
left longerons
Details

 01-03-2007
2.80

Details

 01-02-2007
1.25
dimpel parts

 01-02-2007
1.25

Details

 01-01-2007
8.50
compleated all steps to 10-6 step 4
Details

 01-01-2007
0.00

Details

 12-22-2006
0.00

Details

 12-20-2006
2.50
finished step 1-4 both sides

 12-19-2006
2.50
finished steps 4
Details

 12-18-2006
8.50

Details

 12-17-2006
7.50
finished Horizontal Stabilizer
Details
       

 12-16-2006
6.50
Louis continued on the trim tabs ect.
Details

 12-16-2006
6.00
Compleated step 1 and 2
Details
     

 12-14-2006
2.50
Louie started on the elevator
Details

 12-14-2006
2.50

Details

 12-13-2006
1.50
started riviting inspar parts
Details
       

 12-10-2006
3.50
Final drill Hs
Details

 12-09-2006
3.50
finished rudder
Details

 12-07-2006
3.50
Finished up to step2 page 8-7

 12-06-2006
0.75
mixed gue for rudder

 12-05-2006
1.25


 12-05-2006
1.25

Details

 12-04-2006
2.00
Started Rudder

 12-03-2006
3.50
finished vs start rudder
Details

 12-02-2006
2.50
started Horizontal stab
Details

 12-01-2006
2.50
comple step 1 - 7 must start priming
Details

 11-30-2006
1.35
work on hs

 11-29-2006
1.50
started the rivet although gun needs replace

 11-29-2006
1.50


 11-28-2006
1.50
started hs

 11-28-2006
0.80


 11-27-2006
1.55
primed all parts to this point

 11-26-2006
2.50
finished paint booth ( many parts to be primed)

 11-25-2006
0.65
step 12

 11-24-2006
3.25
took invintory and put items in totes

 11-23-2006
1.25
steps3-12

 11-22-2006
2.50
started paint booth

 11-21-2006
0.65
steps 1 and 2

 11-20-2006
3.85
all steps till 5

 11-19-2006
0.60


 11-18-2006
1.50
steps 1-6

 11-18-2006
3.50
Steps 1-5
Details

 11-17-2006
1.50
Compleate page 6-2
Details

 11-16-2006
3.50
Started
Details

 12-31-1969
2.50
match drill
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.