KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  10-12-2012
Number of Hours:  9.00
Manual Reference:  
Brief Description:  LW fuel cap, tank pressure test, conduit intrsectn

Installed the LW fuel tank cap as per the Right wing, adjusted, oiled and fixed the cap mechanism as per the previous installed cap.

Followed a fellow builder's clear instructions online for pressure testing the tank (initial test) with a balloon and was pleased with perfect function of the vent and inlet fixtures etc, also satisfied at this early test that the tank has no leaks at all. Some additional proseal was applied at the fixtures and certain joins.

The wiring conduit in the RW had to be cut and an intersection installed at the bay in which the servo was installed. I purchased a commercial conduit intersection box and installed it on the conduit line in the right place, the conduit fixings required some adjustment and an additional was required at the rib before the intersection to secure it.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.