KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  10-22-2012
Number of Hours:  7.00
Manual Reference:  
Brief Description:  LW skin prep and match drill, drilled out LW rivet

Hooked up the pitot electrical and routed the loose wiring to run in the conduit.

Installed the LW skin (new) in place with cleco's and finished the match-drilling to standard size and then drilled the relevant holes to #30 as required for 'oops rivets' after rivets were drilled out when I messed up the first installtion.

With all match-drilled I began deburring every hole and then the process of dimpling, with the dimple press and the squeezer for the close in holes, some with #40 and #30 for the matched holes.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.