KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  9-27-2012
Number of Hours:  9.50
Manual Reference:  
Brief Description:  ...cont wing skin riveting

Completed the installation from root to tip of the conduit into the Left or active wing as well as all final installtions to finalize the wing so I can close it up including the Tie-down ring. Also spen some time completely cleaning every bay, and open area and cavity of the wing so that it can be closed up.

With all finalised and the wing ready to be closed up for good I realised something drastic which was that the skins had not been properly primed or corrosion treated on the insides yet...

I had to drill out one line of rivets to peel the skin back and secure it in that position so I could spray the inside surface with primer treatment. A lot of plastic sheeting and masking was applied everywhere to avoid spraying the rest of the wing and the house.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.