KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  7-13-2012
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Supplise, frame final fit, marked hinges to drill

Was out in the morning shopping supplies and to collect my alcad still not returned at the laser cutters I have stopped using...unsucssesfully.

Continued Section 9 'drilling hinges' and 'fitting canopy skin' right through all steps which included duct taping the entire assembled but not riveted canopy frame to the fuselage and aligning the hinges before marking them for drilling. Hinges were marked and checked and ready to be taken off then drilled in a jig.

Also removed the last (righthand) of the two panel ribs to replicate them for cutting in .063 sheet when I get some. Traced a template from one of these parts to be drawn up in cad for cutting.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.