KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  4-20-2012
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Continued front deck install, brakes bled,

continued riveting the front deck structure parts together, riveted the outside cross members to the subpanel at the flanges after match drilling in assembly, this had to be done in conjuction to periodical fitting i place on the cabin and with the panel face in -place to be sure to maintain proper alignment throughout. A case of fit, adjust, remove and rivet then refit.

Continued to bleed the brakes using the pump method but was having no luck in removing the air bubbles so had to devise a better method, after some discussion on the subject I admitedly knew little about, the solution was determined to be to make up a system utilizing some parts I would need to source to effectively 'squeeze' fluid through the system and out the resrvoir along with any bubbles that might show up. I did some initial thought and design of just such a sytem to implement on Monday.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.