KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  3-28-2012
Number of Hours:  10.00
Manual Reference:  
Brief Description:  finalized second brakes installation, inside of ca

Finalized the Brakes and wheel installtion by safteying/torquing and safety wire on all fasteners and slipped protective trunking over the leading loop on the lines at the wheel. Also marked and drilled the cotter pin holes on the axle ends for the wheel nut, left nosewheel then right, struggled with the right and left it for tomorrow. started re installing all the covers, fasteners and nutplates in the cabin to completely finish the interior, also took the seat cushion sets to an upholsterer for a quote and waiting for fabric samples. Next will be to design the concept drawing of the finish for the interior which once approved will serve to guide the upholstere's work.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.