Brief Description: More battery box, Boost pump housing
More work on the battery 'box', box was trimmed to fit better in it's space on the firewall, the lightening holes were resized and cleaned up and deburred, the retaining strap was fabricated from flat bar. Began assembly of the boost pump housing structure and made the necessary modifications to the existing cover/s to accomodate the boost pump assembly. Cleco'd then match-drilled the parts and cut the breather holes as per DWG-OP21.