KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  11-25-2011
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Map box mod, match drilling the deck structure and

Disassembled and cut the map box parts to shorten it enough to fit behind the center of the panel. Match drilled the forward deck structure and marked out the cuts to be made for the panel modification - waiting for the panel to be cut. Studied the firewall layout drawings in preparation for that next job whilst waiting for the panel parts.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.