KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  11-15-2011
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Continued retro work

Focused on the rudder cable exit fairings for 50% of the day, after much trial and error I fabricated 3 iterations of these fairings, all of my own design and dry fitted each to check for suitability and best fit. I have a prefered type but will need to confirm with Willem whether to install these or just order the manufactured set for around $15. Spent 2 hours sourcing the hose we need to replace the fuel lines as agreed and came up empty but for one or two promising leads requiring a drive out to Pretoria city and Rand airport on Wednesday. some time spent on the stab intewrsection covers, now completed.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.