KitLog pro

Powered By Kitlog Pro v2.0

DAN'S WEB SITE
' style=
Date:  11-16-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  electroinics and riveting

The light ribs were riveted onto the wing kit. All of the wires were tested to make sure current went through them. They were then connected into the landing light and it was installed into the wing. The connecters were installed as well, however, the screw would not go into the spacer. we will need to rethread them. Riveting was started on the top of the wing.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.