KitLog pro

Powered By Kitlog Pro v2.0

STANLEY'S WEB SITE
' style=
Date:  5-18-2011
Number of Hours:  5.00
Manual Reference:  
Brief Description:  JSB-031-1

Replaced all of the bottom 6-point nuts with the 12-point nuts. It was as expected and took a lot time. Had to remove muffler, intake and exhaust pipes, remove the 6-point nuts one at a time and replace each with the 12-point nuts. Then I had to reinstall the intake and exhaust pipes and the muffler. I’m still not convinced that it was necessary, but I should be good for another 544.6 hrs. before I have to tear the engine apart and replace the through bolts.
' style=

Bottom with 12-point nuts

Bottom with 12-point nuts

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.