KitLog pro

Powered By Kitlog Pro v2.0

STANLEY'S WEB SITE
' style=
Date:  11-11-2010
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Engine Assembly

Worked on the flywheel and ignition. Torqued all bolts to specs and put torque lock paint on each torqued nut. All bolts installed with specified sealant. installed intake pipes to each cylinder. Rechecked clearance on valves. Installed bottom oil pan. Finished installing gear box and security wired gear bolts.

Overall, we got a lot done leaving a little rechecking and assembly for later.
' style=

Bottom

Bottom

' style=

Oil Pand and Intake Lines

Oil Pand and Intake Lines

' style=

Top

Top

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.