Worked on the flywheel and ignition. Torqued all bolts to specs and put torque lock paint on each torqued nut. All bolts installed with specified sealant. installed intake pipes to each cylinder. Rechecked clearance on valves. Installed bottom oil pan. Finished installing gear box and security wired gear bolts.
Overall, we got a lot done leaving a little rechecking and assembly for later.