Spent first 1.6 hours evaluating plans for leg fairings and tracing them to create vectors for input to CAD/CAM package for CNC cutting of the leg fairing skins for SNB-L06-07L&R.
Studied plans and began work on wheel fairings. Marked cut sides, then taped off area for main axle cuts. Measured 11" from front of fairing, and 2 1/2" up from bottom edge of wheel opening. Made vertical opening for main axle. Clamped left fairing in place to check niitial positioning.
Locating initial point 11" from fairing front, 2 1/2" upp from wheel opening.
Initial axle clearance cut.
temporarily clamped in place to check initial fit.