Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
Landing Gear
4-20-2022
< Previous Log Entry
Next Log Entry >
Date:
4-20-2022
Number of Hours:
3.20
Manual Reference:
SNB-L01
Brief Description:
Hydraulic Brakes And Wheels Final Mounting.
Mounted hydraulic brake assemblies to the axle assemblies.
Had to fully seat the bearing cups into the wheel housing. Then packed bearing with red high-temp wheel bearing grease.
Installed wheels onto the axle/brake assemblies and tightened the axle nuts to turn with light drag and no wobble.
Have not drilled the axle cotter in holes for the castle nuts yet.
Installed axle/hydraulic brake assembly.
Wheels installed with hydraulic brakes.
Main landing gear install completed, less the castle nut cotter pin holes in the axles.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.