KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  7-9-2022
Number of Hours:  2.25
Manual Reference:  SNB-F06 &
Brief Description:  Installed Glare Shield, Fuel Tank And Blank Panel

Reinstalled newly painted glare shield. Copper clecoed in place. Deburred and ready for final rivetting.

Preliminary mounting/positioning of gas tank. Teflon plugged all fittings. Clecoed rear position stop strap and positioned tank aft against it. Ready to add 2 gallons of 100LL fuel to begin seasoning/swelling of the tank to prepare for final mounting.

Preliminary install of the blank instrument panel. Holes are updrilled and deburred, ready for final riveting, but I am planning to add nut plates to the panel rivet flange so I may use screws to secure the instument panel.
' style=

Painted glare shield installed.

Painted glare shield installed.

' style=

Unseasoned fuel tank preliminarily installed and positioned.  Ready to be fuel seasoned (pre-swelled).

Unseasoned fuel tank preliminarily installed and positioned. Ready to be fuel seasoned (pre-swelled).

' style=

Blank instrument panel positioned.  Planning how to use screws for removeability.

Blank instrument panel positioned. Planning how to use screws for removeability.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.