Brief Description: Bushings/Grommets And Tail Cone Box Work.
SNB-F25.
Mounted the 3/4" black plastic bushings for the rudder cables. Installed the four (4) 3/16" ID / 5/16" OD rubber grommets in left side veticals #1 - #4.
SNB-F21.
CNC fabricated and edge-dressed SNB-F21-02 spacer for the tail skid mount.
Drilled pilot holes in upper longerons from SNB-T12-05 angle on lower vertical fin spar. Clecoed SNB-T12-05 angle in place. Discarded spacer used to set angle's position.
SNB-T12-05 angle pilot drilled and clecoed in place.