KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
' style=
Date:  1-8-2022
Number of Hours:  1.60
Manual Reference:  
Brief Description:  Fabricating Fairlead Mounting Blocks.

SNB-F27.

Used CNC to fabricate the fairlead mounting blocks. Layed out the toolpath design, then tooled out the parts.

Also discovered that my Sonex hardware kit from WBPartsExpress was short on the fairlead inserts for the mounting blocks. The kit called for four (4), but there was only four half pieces for the inserts, and no clips.

This completed plans page SNB-F27.
' style=

3D simulation to check tool paths.

3D simulation to check tool paths.

' style=

Cutting the blocks on the CNC bed.

Cutting the blocks on the CNC bed.

' style=

The finished fairlead mounting blocks.

The finished fairlead mounting blocks.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.