Plans: Create a bellcrank. Status: 50% Complete. The bellcrank parts were fabbed today. They need to be welded still. In this case I need some professional help. The bellcrank is used to stabilize the elevator pushrod and gain a little space for the pilot’s seat. A failure would be catastrophic.