Plans: 1. Remake and install torque tube. Status: Complete. 2. Construct Joystick. Status: 90% Complete. The piece parts have been formed, drilled and painted. I need to let the paint dry this week, after that they can be assembled. I elected to replace the aluminum gussets with steel gussets. There was a reported failure of the aluminum ones. The community recommends this change. 3. Install Torque Tube. Status: Complete. The tube is finished and fits perfect. Next however I will need to cut the floorboard thru holes for the hardware to pass. 4. Apply final varnish coat to floorboard. Status: Complete. This is the final (second) coat on the top surface. Another week to dry then I will install it.