Plans: 1. Double up the tailwheel springs. Status: Complete. I decided to add a second spring to the tailwheel. It is now a little stiffer and bounces less when dropped. 2. Begin elevator construction. Status: I completed the layout of the elevator. I was able to form the elephant ears into shape. A good start.