With close attention to detail in the instructions, we selected each specific main rib as discribed in the build instructions and clecoed, then riveted each main rib to the wing spar.
We clecoed the Rear Spar Assembly to the main ribs and match drilled #30 the 3 sections called out on page 15-04 then removed all the clecos and deburred all holes we match drilled.
We then reattached the Rear Spar Assembly with clecos and then riveted the Rear Spar Assembly to the Main Ribs using the specific rivets called for on the instructions.
Nick's hours: 2.75 Amber's hours: 2.25 Total combined for 7/18/2022: 5hrs
Main Ribs attached & rear view of doubler
Rear Spar Assembly going on (Nick) for match drilling