started working on the instrument panel. There are several boxes (LRU) that need to be installed as part of the G3X system : Garmin GAD29,, GEA24:, GSU25:, GMU22:, GPT59: GDL39R, Princeton fuel converters, Advanced flight AOA brain etc. I dont want to attach these boxes to the baggage bulkhead since i want to do a lot of traveling in this plane and im concerned about screws brackets etc snagging on the baggage.