Page 8-65 Clecoed the two F-807D-1 harness fairleads in place Final drilled #40 the 3/32 holes common between the F-807D-1 harness fairleads and the F-807B-1 bulkhead Final drilled #40 the 3/32 holes used to attach the two nutplates to the F-808B-1 bulkhead Clecoed the F-807B-1, F-808B-1 and F-809B-1 bulkheads to the bulkhead assemblies in the fuselage Final drilled #30 the 1/8 holes common between the bulkhead assemblies Deburred the edges of the F-869-L-1 and R-1 bulkhead gussets Clecoed the F-810A-1 bulkhead to the forward flange of the F-819-1 aft deck and final drilled the #30 holes common between the aft deck and the F810-A-1 bulkhead